Proposed 1000A LV Switchboard and Feeder Cables installation at CPF House Nairobi.

CPF-House-Nairobi-1000A-LV-Switchboard-Feeder-Cable-Installation-Mordecai-Consulting-EngineersCPF-House-Nairobi-1000A-LV-Switchboard-Feeder-Cable-Installation-Mordecai-Consulting-Engineers-NairobiThe project is to install a new switch board and feeder cables at CPF house Nairobi. The estimated cost is Ksh 14,000,000.00 the project commenced on 23rd July, 2018 and the completion date is on 17th September, 2018. Lead consultant is Mordecai Consulting Engineers